Meta
BuildingHyperion
Designed to scale toward 5 GW. This is the maximum planned cluster scale, not today’s energized IT load.
Public capacity leaderboard · July 2026
One major campus per operator or consortium, ranked by its largest comparable public power figure—not by total worldwide fleet size.
Hyperion
Designed to scale toward 5 GW. This is the maximum planned cluster scale, not today’s energized IT load.
Project Rainier
The full campus figure includes the active Trainium AI cluster and continued expansion; AWS does not publish a separate live IT-load figure.
Pecos AI Campus
Microsoft says roughly 2 GW will be delivered over five to seven years, so the ranking uses the final planned scale.
Silver Springs Campus
The site can support up to 1.6 GW. Its initial 700 MW remains subject to phased utility studies and tenant delivery.
Oxagon AI Factory
The first investment phase is one part of a 1.5 GW renewable-powered AI factory planned to enter service from 2028.
Frontier
The full-build plan spans ten data centers engineered for dense, liquid-cooled AI deployments.
Monarch AI Campus
The up-to figure comes from a Microsoft Vera Rubin compute letter of intent, not currently energized capacity.
Stargate UAE
The dedicated cluster starts with a 200 MW phase inside the wider 5 GW UAE–US AI campus.
Visakhapatnam AI Hub
Google says “gigawatt-scale” but gives no exact MW. A 1,000 MW proxy is used only to place the project in this ranking.
Jamnagar AI Campus
Reliance describes the wider campus program as gigawatt-scale. The separately contracted first Meta facility is 168 MW.
Escaudain AI Campus
A future cloud and AI campus whose published figure represents the completed site rather than an operating hall.
S7 Sydney
NEXTDC markets S7 as a 550+ MW AI-ready campus; delivery remains subject to approvals and phased construction.
Project Caprock
Published campus capacity across six cloud and AI-ready facilities, not one data hall.
YTL Green Data Center Park
The operational NVIDIA AI deployment occupies only part of the wider renewable-powered data center park.
DEN02 Varde
The 500 MW campus begins with an initial 250 MW development phase.
Ferrera Erbognone AI Campus
The figure is covered by heads of terms; final partnership terms and phase delivery still matter.
Red Oak Campus
The final campus is planned for 480 MW; its first construction phase accounts for 240 MW.
Polaris Forge 1
The company filing reports 100 MW energized with the remaining campus capacity under construction in 2026.
STT Jakarta Campus
The long-range IT-capacity pipeline spans several buildings and delivery phases rather than one live hall.
DFW Red Oak
The operator publishes campus scale; tenant-specific AI load remains undisclosed.
SYD3
The live hyperscale campus supports high-density AI deployments but is not used exclusively for AI.
Lancaster AI Data Center
The initial committed facility is 100 MW, with expansion potential taking the site toward 300 MW.
Chicago ORD01 Campus
The published total covers three AI-ready buildings at different delivery stages.
Phoenix Campus
The figure covers the entire expanding campus; each individual operational building is smaller.
Johor Bahru Campus
A hyperscale campus designed for cloud and AI/ML workloads, with capacity delivered in phases.
Greater Osaka Campus
The AI-ready campus is under construction, with its first phase expected to enter service in 2028.
Atlanta West
A purpose-built AI-ready hyperscale campus whose published capacity represents full development.
Dugny Digital Hub
The total IT capacity spans three AI-ready facilities; the first delivery is planned for 2027.
LON6
A planned London-region facility; the figure is not current operating load.
Amsterdam Westpoort AMS01
The substation is live while the data halls remain under phased construction.
Public disclosures change quickly and often mix future campus envelopes with operational load. Google and Reliance use “gigawatt-scale” wording, so 1,000 MW is only a sorting proxy. xAI, HUMAIN, Baidu, Alibaba Cloud, and Switch are not force-ranked where a comparable official single-campus MW figure could not be verified.